Blog

Fennell & Blake Ltd, Headington

Piled Slab Foundations

We were pleased to offer the complete foundation package for Fennell & Blake Ltd, to support the new development in Headington. We installed 26no. 350mm Diameter bearing piles and a reinforced 275mm slab foundation.

Bearward Engineering, Northampton

Reinforced Pile Caps 

InmotionUK Ltd were contracted to install 6no. Pile caps to support the clients new slider crane. These pile caps each consisted of 4no. 300mm diameter piles bored to 8m in depth. Reinforced cages tied into the pile with hold down bolts to take the steels. 

Nicholas Bolt Ltd, Henley-on-Thames

Reinforced Foundations & Retaining wall (including drainage)

For this extension contract in Purley, Henley-on-Thames. We were lucky enough to be awarded two aspects of the works involved. This included the demolition, foundations, retaining walls and drainage, including treatment tank and pumping station. This was a complex contract due to the access and working area involving two finished floor levels. 

Nicholas Bolt Ltd, Henley

Piling, Ground Beams & Slab

Another stunning Project that we had the pleasure of doing for Nicholas Bolt Ltd in Henley. This consisted of both Piling and Groundworks (reinforced raft). 

Acheson Construction, Oxford (Easy Hotel)

CFA Piling

Here in Oxford for Acheson Construction Ltd, we installed 162no. 600mm diameter Bearing Piles at a depth of 24 meters to support the new Easy Hotel development.

Knowles Construction, Henley 

CFA Piling & Ground Beams

We had the pleasure to work on this fantastic house build in Henley, installing CFA piles for both bearing and retaining purposes to support the drive way and stone walls. Our works included the reinforcement and shuttering for the ground beams.